New Floor; New Lighting

Work is progressing in the nave.

At his shop Mr. Ruwet assembled the framing that will “raise” the center aisle so that is flush with flooring under the pews. In these photos, Scott can be seen installing the frames.

Also, please note how bright it is in the nave. Most of the new LED lighting has been installed. Even without a fresh coat of paint, the nave looks so much better. The covers that shield the fixtures and reflect the light up and down have been removed while the walls are painted.

Painting will begin very soon.